Oliver Auto. Shrink Tunnel Oliver Auto. Shrink Tunnel Unit Uses Electric Heating Combined With Recirculating Air Thermostatic Control Variable Up To 500 Degrees F 4-zone Monitoring High-temp Limit Switches To Prevent Unit Overheating 18in. Wide X 7in. High Tunnel Opening (Pre-shrink Area: 16in. Wide X 34in. Long) Conveyor Driven By D.C. Motor Power Requirements: 3/60/230 Volt 100 Amps 37.5 Kva (27,500 Watts On Heate With 2 - 1-1/2 Hp Blower Motors Floor Space: 25in. Wide X 124in. Long Manuals And Prints In Box On Print File Last Used With Wrapper #21300a-127b
Have Inventory to Purchase or Sell?
Looking to purchase equipment? Have one of these to sell?